Photograph of the completed project

All work

Noorderhof Housing

84 homes around a shared court, built to a 100-year structural life with a façade designed to be replaced without it.

Client

Woonstad Amsterdam

Location

Amsterdam, NL

Year

2025

Area

11,200 m²

Typology

Housing

Status

Under Construction

Brief

Brief

Woonstad Amsterdam wanted 84 homes on a constrained inner block with a hard cost cap and a 100-year design life.

Approach

Approach

We separated the two clocks in the building. The concrete frame and the cores are designed for a century. The façade is a demountable panel system designed for forty years and replaceable without touching the structure or moving a single household out.


Every home has a through-view and a door onto the shared court.

Outcome

Outcome

On site, completing 2025. The panel system is the reason the project cleared its cost cap: it moved 22% of the envelope cost off the critical path and into factory production.

Plates

Interior plate from the project
Second interior plate from the project

Credits

Credits

Structural engineer: Pieters Bouwtechniek · Contractor: Heijmans